Close

Data details

    

<
Back
Taxonomy tree DisplayHide Taxonomy tree
Number of page views : 218
TitleMeasures against water leakage from the accumulated water transfer pipeline in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station (Report; No.2) (Attachment)
PublisherTEPCO
Issued date2012-09-13
Languageeng
Page47p.
Typereport
File FormatPDF
Taxonomy4-4-1-3 Site decontamination
Taxonomy4-4-1-6 Waste management
Taxonomy5-3 Waste management
Taxonomy(Computer Assigned)4-4-1 On-site decontamination   5. Scientific and Technical Support   
Information sourceGo to the saved web page
Upper page titleReport on the Measures against Water Leakage from the Accumulated Water Transfer Pipeline in Unit 4 Turbine Building at Fukushima Dai-ichi Nuclear Power Station to the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (No.2)
Related content
Related sites
時間軸情報:汚染水対策
時間軸情報:処理・処分・環境回復
URIhttps://f-archive.jaea.go.jp/dspace/handle/faa/36223
collect date(WARP)2013-01-11