Steel beam which fell into the pool (When being lifted) Photo taken on December 20, 2012
(上位階層ページタイトル/会議名: Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Dai-ichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool)
情報提供機関: 東京電力
掲載日/会議開催日: 2012-12-20
Steel beam which fell into the pool (After being removed) Photo taken on December 20, 2012
Fukushima Daiichi Nuclear Power Station (Length; 5 minutes 30 seconds) (5; 30)
Location of the steel beam Photo taken on September 22, 2012
掲載日/会議開催日: 2012-12-19
Mockup test (Steel beam being hung) Photo taken on November 6, 2012
Mockup test (Steel beam being grabbed Photo taken on November 6, 2012
Liner protection installation Photo taken on November 6, 2012
Liner protection material (Single tube) Photo taken on November 6, 2012
Visibility distance; 2.5m Photo taken on November 6, 2012
Visibility distance; 5.0m Photo taken on December 13, 2012