Fukushima Daiichi Nuclear Power Station Unit 1 Reactor Building Torus Room Investigation Result (June 26, 2012)
(上位階層ページタイトル/会議名: Photos and videos library June 2012)
情報提供機関: 東京電力
掲載日/会議開催日: 2012-06-27
Current Condition of Fukushima Daiichi Nuclear Power Station
掲載日/会議開催日: 2012-06-26
Water Stop Work at the Area Water Inflow into Unit 3 Radiation Waste Underground Storage Facility Building was Confirmed at Fukushima Daiichi Nuclear Power Station
掲載日/会議開催日: 2012-06-25
Water Overflow from the Plastic Container near Desalination System (Reverse Osmosis Membrane) No.2 at Fukushima Daiichi Nuclear Power Station
掲載日/会議開催日: 2012-06-23
Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Control System Duct Damage
掲載日/会議開催日: 2012-06-19
Investigation Result of the Water leak from the Decontamination Apparatus (Occurred on June 14)
掲載日/会議開催日: 2012-06-18
Action towards monitoring and decontamination
掲載日/会議開催日: 2012-06-15
The Protection platform installation on Unit 4 spent fuel pool at Fukushima Daiichi Power Station
Water leak from the Decontamination Apparatus
掲載日/会議開催日: 2012-06-14
Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
Fukushima Daiichi Nuclear Power Station Unit 2 S/C water level measurement by an infrared camera
掲載日/会議開催日: 2012-06-12
Reliability Enhancement Work for the Cesium Absorption Apparatus
The Protection platform added on Unit 4 spent fuel pool at Fukushima Daiichi Power Station
掲載日/会議開催日: 2012-06-08
Motor Cable Connection for the Secondary System Circulation Pump (B) of Unit 4 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station
Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
掲載日/会議開催日: 2012-06-07
The Accumulated water found at Unit 2 radioactive waste underground storage facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
Unit 4 Spent Fuel Pool Alternative Cooling System Secondary System Circulation Pump (A) Situation of the Burnt Area Near the Motor Terminal Housing
掲載日/会議開催日: 2012-06-05
Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report; May 2012)
Decontamination around the truck bay door at Unit 2, Fukushima Daiichi Nuclear Power Station
掲載日/会議開催日: 2012-06-01
Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi Nuclear Power Station