検索結果一覧: 1-20 / 24
検索項目(タイトル、種別等)を切り替えることができます
検索条件を追加
検索項目(WARP保存日等)を切り替えることができます
ページに表示されているデータを出力します
Repair overview of the lower section of the PCV (water stop method by grouting inside vent pipe)
(上位階層ページタイトル/会議名: Preliminary Test for "Water Stoppage Method" by Grouting into the Vent Pipe ("Water stop material" used after conducting a combined test of "Water stop material" and "Support material") (Toshiba))
情報提供機関: 国際廃炉研究開発機構
掲載日/会議開催日: 2014-04-17
Complete view of testing device for water stoppage method by grouting inside the vent pipe_No.1
Installation of piping to the testing device for grouting _No.1
Installation of piping to the testing device for grouting _No.2
Complete view of testing device for water stoppage method by grouting inside the vent pipe_No.2
Installation of a camera to the testing device for recording/observing
Simulated portion of vent header for testing device (tanks for storage and measurement of water leakage)
Close view of simulated portion of vent header for testing device (tanks for storage and measurement of water leakage)
Inflatable bag expanding around the interference, and water leaking from the gap, as viewed from vent header.
Mixing additive agent to be used in the cement-based material
Simulated portion of vent header for testing device (when water leaks)
Branch pipes to collect sample for quality control test during grouting and material storage facility
Placement of water stop material
Sampling test for quality control during placement of water stop material
Cement-based water stop material used for the test this time (plastic grout)
Grouting construction (placing by the tremie method)
Checking piling up status of water stop material, as viewed from monitoring window on the testing device.
Simulated portion of vent header for testing device (after placing water stop material)
Cement-based water stop material used for the test (plastic grout)
Checking status of water stop material piled up