No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 Functional check (Completed on September 27, 2012) Photo taken on September 27, 2012 TEPCO 2012-10-02
2 Control board being lifted up by a crane truck Photo taken on September 21, 2012 TEPCO 2012-10-02
3 High-voltage panel being lifted up by a crane truck Photo taken on September 11, 2012 TEPCO 2012-10-02
4 Carry-in of the control board etc. into the building (Completed on September 21, 2012) Photo taken on September 26, 2012 TEPCO 2012-10-02
5 Power panel being lifted up by a crane truck Photo taken on September 3, 2012 TEPCO 2012-10-02
6 Carry-in of the power panel Photo taken on September 3, 2012 TEPCO 2012-10-02
7 Power panel installation Photo taken on September 3, 2012 TEPCO 2012-10-02
8 Power panel being fixed (Bolt installation) Photo taken on September 3, 2012 TEPCO 2012-10-02
9 Power panel (P/C 2C-2) installation (Completed on September 11, 2012) Photo taken on September 26, 2012 TEPCO 2012-10-02
10 Full view of the residual heat removal equipment cooling seawater system pump (B) Photo taken on September 26, 2012 TEPCO 2012-10-02
11 Installation of the electric motor of the residual heat removal equipment cooling seawater system pump (B) (Completed on September 11, 2012) Photo taken on September 26, 2012 TEPCO 2012-10-02
12 Full view of the residual heat removal equipment cooling seawater system pump c Photo taken on September 26, 2012 TEPCO 2012-10-02
13 Installation of the electric motor of the residual heat removal equipment cooling seawater system pump (C) (Completed on September 13, 2012) Photo taken on September 26, 2012 TEPCO 2012-10-02
14 Functional check of power panel (P/C 3C-2) (Permanent installation completed on August 27, 2012) Photo taken on August 27, 2012 TEPCO 2012-10-02
15 Switching to the permanent cable for the electric motor of the residual heat removal equipment cooling system pump c Photo taken on September 13, 2012 TEPCO 2012-10-02
16 Permanent cable installation for the electric motor of the residual heat removal equipment cooling system pump (C) (Permanent installation completed on September 13, 2012) Photo taken on September 13, 2012 TEPCO 2012-10-02
17 Switching to the permanent cable for the electric motor of the residual heat removal equipment cooling system pump (A) (Permanent installation completed on September 12, 2012) Photo taken on September 13, 2012 TEPCO 2012-10-02
18 Permanent cable installation for the electric motor of the emergency diesel generator cooling system pump (A) (Permanent installation completed on September 6, 2012) Photo taken on September 13, 2012 TEPCO 2012-10-02
19 Full view of the residual heat removal equipment cooling seawater system pump (A) Photo taken on September 13, 2012 TEPCO 2012-10-02
20 Permanent cable installation for the electric motor of the residual heat removal equipment cooling seawater system pump (A) (Permanent installation completed on September 11, 2012) Photo taken on September 13, 2012 TEPCO 2012-10-02