Balloon (Placed in sideways) Photo taken on October 24, 2012
(上位階層ページタイトル/会議名: Results of Reinvestigation of Unit 1 Operation Floor at Fukushima Dai-ichi Nuclear Power Station)
情報提供機関: 東京電力
掲載日/会議開催日: 2012-10-24
Balloon floating in the equipment hatch (Image taken from below) Photo taken on October 24, 2012
Balloon (Vertically placed) Photo taken on October 24, 2012
Image of the north side taken from the balloon Photo taken on October 24, 2012
Image of the northeast side taken from the balloon Photo taken on October 24, 2012
Image of the east side taken from the balloon Photo taken on October 24, 2012
Spent fuel pool water surface (1) *image not provided in the handout Photo taken on October 24, 2012
Spent fuel pool water surface (2) *image provided in the handout Photo taken on October 24, 2012
Part of the overhead traveling crane Photo taken on October 24, 2012
Results of Reinvestigation of Unit 1 Operation Floor at Fukushima Daiichi Nuclear Power Station <Digest version> (2; 55)