戻る

検索結果一覧

    
No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 [Submerged] Inside of Heat Exchanger Building(RHRC pump (C) at 1st floor of Heat Exchanger Building, Unit 4) ; Situation after the disaster(3/13) [pictured on March 13, 2011]保存されたウェブページへ TEPCO 2011-09-06
2 [Submerged] Inside of Heat Exchanger Building(RHRC pump (C) at 1st floor of Heat Exchanger Building, Unit 4) ; Current situation(8/26) [pictured on August 26, 2011]保存されたウェブページへ TEPCO 2011-09-06
3 [Submerged] Inside of Heat Exchanger Building (Stairs between 1st floor and B1 of Heat Exchanger Building, Unit3) ; Situation after the disaster(3/16) [pictured on March 16, 2011]保存されたウェブページへ TEPCO 2011-09-06
4 [Submerged] Inside of Heat Exchanger Building (Stairs between 1st floor and B1 of Heat Exchanger Building, Unit3) ; Current situation(8/29) [pictured on August 29, 2011]保存されたウェブページへ TEPCO 2011-09-06
5 [Submerged] Pump of Equipment Cooling Water System (RCW2 pump (B) at B1 of Heat Exchanger Building, Unit 4) ; Situation after the disaster(3/23) [pictured on March 23, 2011]保存されたウェブページへ TEPCO 2011-09-06
6 [Submerged] Pump of Equipment Cooling Water System (RCW2 pump (B) at B1 of Heat Exchanger Building, Unit 4) ; Current situation(8/26) [pictured on August 26, 2011]保存されたウェブページへ TEPCO 2011-09-06
7 [Not Submerged] Pump of emergency equipment cooling water system (1st floor of Hear Exchanger Building, Unit 3) ; Situation after the disaster(3/19) [pictured on March 19, 2011]保存されたウェブページへ TEPCO 2011-09-06
8 [Submerged] P/C Power Panel (1st floor of Heat Exchanger Building, Unit 1) ; Situation after the disaster(3/13) [pictured on March 13, 2011]保存されたウェブページへ TEPCO 2011-09-06
9 [Not Submerged] P/C power panel (1st floor of heat exchanger building, Unit 3) ; Situation after the disaster(4/2) [pictured on April 02, 2011]保存されたウェブページへ TEPCO 2011-09-06
10 Installation of Temporary Cables from Waste Treatment Facility(East Side of Waste Treatment Facility) ; Situation after the disaster[1](3/13) [pictured on March 13, 2011]保存されたウェブページへ TEPCO 2011-09-06
11 Installation of Temporary Cables from Waste Treatment Facility(East Side of Waste Treatment Facility) ; Situation after the disaster[2](3/13) [pictured on March 13, 2011]保存されたウェブページへ TEPCO 2011-09-06
12 Installation of Temporary Cables from Waste Treatment Facility(East Side of Waste Treatment Facility) ; Current situation(8/26) [pictured on August 26, 2011]保存されたウェブページへ TEPCO 2011-09-06
13 Powered by High Voltage Power-Supply Car (North Side of Heat Exchanger Building) ; Situation after the disaster(4/2) [pictured on April 02, 2011]保存されたウェブページへ TEPCO 2011-09-06
14 Debris scattered by Tsunami ; Situation after the disaster(3/16) [pictured on March 16, 2011]保存されたウェブページへ TEPCO 2011-09-06
15 Debris scattered by Tsunami ; Current situation(8/29) [pictured on August 29, 2011]保存されたウェブページへ TEPCO 2011-09-06
16 [Submerged] Emergency back-up diesel generator (Emergency DG(A) , Unit 1) ; Situation after the disaster(3/20) [pictured on March 20, 2011]保存されたウェブページへ TEPCO 2011-09-06
17 [Submerged] Emergency back-up diesel generator (Emergency DG(A) , Unit 1) ; Current situation(8/26) [pictured on August 26, 2011]保存されたウェブページへ TEPCO 2011-09-06
18 [Not Submerged] Emergency back-up diesel generator (Emergency DG(B) , Unit 2) ; Situation after the disaster(3/22) [pictured on March 22, 2011]保存されたウェブページへ TEPCO 2011-09-06
19 [Submerged] Emergency air blower for Emergency DG (Emergency air blower for Emergency DG, Unit 1) ; Situation after the disaster(3/20) [pictured on March 20, 2011]保存されたウェブページへ TEPCO 2011-09-06
20 [Submerged] Emergency air blower for Emergency DG (Emergency air blower for Emergency DG, Unit 1) ; Current situation [pictured on August 26, 2011]保存されたウェブページへ TEPCO 2011-09-06