Back
Taxonomy tree DisplayHide Taxonomy tree
Number of page views | : | 188 |
Title | Direct Cause, Root Cause Attributed to the Organizational System and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to Inadequate Equipment Maintenance at Kashiwazaki-Kariwa Nuclear Power Station (Interim Report) (Attachment) |
Publisher | TEPCO |
Issued date | 2012-08-13 |
Language | eng |
Page | 38p. |
Type | report |
File Format | |
Taxonomy | 4-6-2 Root causes analysis |
Taxonomy | 2-3-4 Long term operation management |
Taxonomy(Computer Assigned) | 4-6 Emergency and response analysis 2-3 Operation |
Subject/Session_name | Kashiwazaki Kariwa Nuclear Power Station |
Information source | Go to the saved web page |
Upper page title | Interim Report on the Direct Cause, Root Cause and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to the Inadequate Maintenance of the Measurement Control Equipments Installed in the Units under Long-term Suspension at Kashiwazaki-Kariwa Nuclear Power Station |
Related content | |
URI | https://f-archive.jaea.go.jp/dspace/handle/faa/36421 |
collect date(WARP) | 2013-01-11 |
- When indicating the contents of the title, please click icon.
- Please use URI to cite or link to this data.
- Data in Archive are protected by copyright, with all rights reserved, unless otherwise indicated.