1 過酷事故解析コードMAAPによる炉内状況把握に関する研究 (12) - 改良MAAPによる福島第一原子力発電所2/3号事故進展解析

小島 良洋(技術研究組合 国際廃炉研究開発機構)(東芝(株)); 千原 瑠為(技術研究組合 国際廃炉研究開発機構)(東芝(株)); 狩野 喜二(技術研究組合 国際廃炉研究開発機構)(東芝(株))

2015-09-09
2 東京電力(株)福島第一原子力発電所炉内状況把握の解析・評価 (50) - 福島第一原子力発電所1~3号機の事故進展に関する分析

本多 剛(東京電力(株)); 溝上 伸也(東京電力(株)); 溝上 暢人(東京電力(株)); 山内 大典(東京電力(株)); 山中 康慎(東京電力(株))

2015-03-20
3 Survey map of Fukushima Daiichi Nuclear Power Station - Reactor Building - Reactor Building survey Map [2013-03-22]

TEPCO

2013-03-22
4 Debris removal from the upper part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station; Removal of the Steel Beam Which Fell into the Pool

TEPCO

2012-12-20
5 Fukushima Daiichi Nuclear Power Station (Length; 5 minutes 30 seconds) (5; 30)

TEPCO

2012-12-20
6 Debris removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station; Removal of the Steel Beam Which Fell into the Pool

TEPCO

2012-12-19
7 After the water stop work was completed [photo taken on December 4, 2012]

TEPCO

2012-12-05
8 Investigation results of suspension of Unit 3 spent fuel pool desalination system (Mobile RO) and hydrochloric acid leakage at Fukushima Daiichi Nuclear Power Station

TEPCO

2012-11-27
9 A Supplementary explanation added on the report on the steel beam falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station in response to the additional directive document received from the Nuclear Regulation Authority

TEPCO

2012-11-15
10 Additional report on the steel beam falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station (Attachment)

TEPCO

2012-11-15
11 Cover installation for fuel removal at Unit 3 (Northwest side)

TEPCO

2012-11-14
12 Hydrochloric acid leakage from Unit 3 Spent Fuel Pool desalination system (Mobile RO) at Fukushima Daiichi Nuclear Power Station

TEPCO

2012-10-24
13 Additional report on the steel beam falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station (Attachment)

TEPCO

2012-10-19
14 Electric Motor of Fuel Exchanger Photo taken on October 11, 2012

TEPCO

2012-10-15
15 Deck Plate Photo taken on October 11, 2012

TEPCO

2012-10-15
16 Fuel Storage Rack Photo taken on October 12, 2012

TEPCO

2012-10-15
17 Deposited Material over Fuel Storage Rack Photo taken on October 12, 2012

TEPCO

2012-10-15
18 Endtrack of Fuel Exchanger Photo taken on October 12, 2012

TEPCO

2012-10-15
19 Investigation of the Inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi NPP (October 11) (2; 01)

TEPCO

2012-10-15
20 Investigation of the Inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi NPP (October 12) (3; 02)

TEPCO

2012-10-15