戻る

検索結果一覧

    
No.

タイトル

著者

掲載日/会議開催日
1 Viewing Units 1-4 from high ground (Photos taken on October 16, 2021)

TEPCO

2021-10-17
2 RPV下部構造破損・炉内物質流出挙動のMPS法による予測(委託研究)

吉川 信治; [Yoshikawa, Shinji]; 山路 哲史; [Yamaji, Akifumi]

2021-09
3 Unit3 reactor building operation floor

TEPCO

2018-11-07
4 Structures inside Unit3 PCV (1)

TEPCO

2018-04-26
5 Structures inside Unit3 PCV (2)

TEPCO

2018-04-26
6 Deposits inside Unit3 PCV (1)

TEPCO

2018-04-26
7 3D reconstruction results, Unit3 PCV (1)

TEPCO

2018-04-26
8 3D reconstruction results, Unit3 PCV (2)

TEPCO

2018-04-26
9 3-D Rendering of Images obtained during the Fukushima Daiichi Nuclear Power Station Unit3 Primary Containment Vessel (PCV) Internal Investigation

TEPCO

2018-04-26
10 Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings

TEPCO

2018-04-02
11 Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings

TEPCO

2018-03-26
12 Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings

TEPCO

2018-03-19
13 Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings

TEPCO

2018-03-12
14 Progress of Unit 3 PCV internal investigation (Preliminary report of July 22 investigation)

TEPCO

2017-07-22
15 Progress of Unit 3 PCV internal investigation (Preliminary report of July 21 investigation)

TEPCO

2017-07-21
16 Progress of Unit 3 PCV internal investigation (Preliminary report of July 19 investigation)

TEPCO

2017-07-19
17 Preparation for fuel removal from the spent fuel pool in Unit 3 reactor building at Fukushima Daiichi Nuclear Power Station

TEPCO

2016-01-18
18 Fukushima Daiichi Nuclear Power Station; Investigation results with an underwater camera in Unit3 Spent Fuel Pool

TEPCO

2015-08-04
19 Fukushima Daiichi Nuclear Power Station investigation results with an underwater camera in Unit3 spent fuel pool (Reference)

TEPCO

2015-08-04
20 Gas Sampling Results of Unit 3 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station

TEPCO

2014-12-19