戻る

検索結果一覧

    
No.

タイトル

著者

掲載日/会議開催日
1 Measures for mid-term risk reduction at TEPCO's Fukushima Daiichi Nuclear Power Station (as of March 2016)

Nuclear Regulation Authority

2016-03-31
2 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2014-06-20
3 Nuclide analysis result of radioactive materials in the air at the upper part of the Unit 4 Reactor Building of Fukushima Daiichi Nuclear Power Station [2014-05-26]

TEPCO

2014-05-26
4 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2014-04-23
5 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2014-03-19
6 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2014-02-26
7 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2014-01-29
8 Unit No.4 reactor building and fuel removal cover

International Research Institute for Nuclear Decommissioning

2014-01-14
9 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2013-12-20
10 Arrival times of tsunami at the Fukushima Daiichi Nuclear Power Station site

TEPCO

2013-12-13
11 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building

TEPCO

2013-11-27
12 Decontamination work on the first floor at Unit 2 reactor building in Fukushima Daiichi NPS

TEPCO

2013-11-27
13 The Nuclear Regulation authority(NRA)'s actions toward TEPCOs fuel removal from Unit 4 Reactor Building in Fukushima Daiichi Nuclear Power Station

Nuclear Regulation Authority

2013-11-15
14 The Nuclear Regulation authority(NRA)'s actions toward TEPCOs fuel removal from Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station

Nuclear Regulation Authority

2013-11-14
15 Fukushima Daiichi NPS Unit 3 reactor building regarding the incident where a jib mast at the tip of a remote-control large crane was bent down [Cause and countermeasures]

TEPCO

2013-09-24
16 (Document used in the contaminated water and tank countermeasures) Efforts for decommissioning of Unit 1 to 4 Reactors in TEPCO

TEPCO

2013-09-13
17 Units 1-2 torus room investigation at Fukushima Daiichi Nuclear Power Station

TEPCO

2013-01-25
18 Nearby Unit4 Reactor Building (1) [Photo taken on November 30, 2012]

TEPCO

2012-12-03
19 Nearby Unit4 Reactor Building (2) [Photo taken on November 30, 2012]

TEPCO

2012-12-03
20 Operating Floor in Unit4 Reactor [Photo taken on November 30, 2012]

TEPCO

2012-12-03