1 Water levels of accumulated water [07; 00 Aug 12, 2011]保存されたウェブページへ METI 2011-08-12
2 Seismic damage information (the 228th Release) [As of 15; 00 August 12, 2011]保存されたウェブページへ METI 2011-08-12
3 (Extract) Seismic damage information (the 228th Release) [As of 15; 00 August 12, 2011]保存されたウェブページへ METI 2011-08-12
4 Regarding the receipt of a report on the improvements related to the exposure exceeding dose limit of radiation workers during emergency work at Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Co., Inc.保存されたウェブページへ METI 2011-08-12
5 Analysis sheet of accumulated water treatment results保存されたウェブページへ TEPCO 2011-08-12
6 Nuclide analysis results of radioactive materials in seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 11)保存されたウェブページへ TEPCO 2011-08-12
7 Nuclide analysis results of radioactive materials in seawater Fukushima Daiichi Nuclear Power Station - the shallow draft quay, Unit 1-4 screen, and the water intake canal of Units 1-4 (Appendix)保存されたウェブページへ TEPCO 2011-08-12
8 Nuclide analysis results of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (140th release)保存されたウェブページへ TEPCO 2011-08-12
9 Nuclide analysis results of radioactive materials in the air at the sites of Fukushima Nuclear Power Stations (Appendix)保存されたウェブページへ TEPCO 2011-08-12
10 Fukushima Daiichi Nuclear Power Station - The results of dust nuclide analysis (appendix)保存されたウェブページへ TEPCO 2011-08-12
11 Fukushima Daini Nuclear Power Station - The results of dust nuclide analysis (Appendix)保存されたウェブページへ TEPCO 2011-08-12
12 Detection of radioactive materials from seawater near Fukushima Daiichi Nuclear Power Station (142nd release)保存されたウェブページへ TEPCO 2011-08-12
13 Results of nuclide analysis of seawater (Attachment)保存されたウェブページへ TEPCO 2011-08-12
14 Report to NISA regarding the improvement of radiation exposures by workers who have exceeded dose limit while engaged in emergency works at Fukushima Daiichi Nuclear Power Station保存されたウェブページへ TEPCO 2011-08-12
15 Improvement of radiation exposures by workers who have exceeded dose limit while engaged in emergency works at Fukushima Daiichi Nuclear Power Station [Summary] (Appendix)保存されたウェブページへ TEPCO 2011-08-12
16 Improvement of radiation exposures by workers who have exceeded dose limit while engaged in emergency works at Fukushima Daiichi Nuclear Power Station [Full report] (Appendix)保存されたウェブページへ TEPCO 2011-08-12
17 Power Supply and Demand Outlook in This Summer and Measures(10th Release)保存されたウェブページへ TEPCO 2011-08-12
18 Power Supply to Tohoku Electric Power Company保存されたウェブページへ TEPCO 2011-08-12
19 今夏の需給見通しと対策について(第10報)保存されたウェブページへ 東京電力 2011-08-12
20 東北電力(株)への電力融通実施について [2011年08月12日]保存されたウェブページへ 東京電力 2011-08-12