1 Regarding the state of storage and treatment of accumulated water containing high concentration of radioactive materials at Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Co., Inc. (19th Report)保存されたウェブページへ METI 2011-11-02
2 Water levels of accumulated water [11; 00 Nov 02, 2011]保存されたウェブページへ METI 2011-11-02
3 Seismic damage information (the 288th Release) [As of 14; 00 November 2, 2011]保存されたウェブページへ METI 2011-11-02
4 (Extract) Seismic damage information (the 288th Release) [As of 14; 00 November 2, 2011]保存されたウェブページへ METI 2011-11-02
5 Overview of the blocking operation of the units 1 - 4 openings保存されたウェブページへ TEPCO 2011-11-02
6 Stair at Unit 1 Turbine Building (1F) Before block [pictured on July 23, 2011]保存されたウェブページへ TEPCO 2011-11-02
7 Stair at Unit 1 Turbine Building (1F) After Block [pictured on October 5, 2011]保存されたウェブページへ TEPCO 2011-11-02
8 Stair at On-site Bunker Building (2F) Before block [pictured on July 29, 2011]保存されたウェブページへ TEPCO 2011-11-02
9 Stair at On-site Bunker Building (2F) After Block (1) [pictured on October 9, 2011]保存されたウェブページへ TEPCO 2011-11-02
10 Stair at On-site Bunker Building (2F) After Block (2) [pictured on October 9, 2011]保存されたウェブページへ TEPCO 2011-11-02
11 Hatch at On-site Bunker Building (2F) Before block [pictured on July 29, 2011]保存されたウェブページへ TEPCO 2011-11-02
12 Hatch at On-site Bunker Building (2F) After Block [pictured on October 9, 2011]保存されたウェブページへ TEPCO 2011-11-02
13 Unit 1 Turbine Building ; Entrance of heater room (1F) Before block [pictured on July 23, 2011]保存されたウェブページへ TEPCO 2011-11-02
14 Unit 1 Turbine Building ; Entrance of heater room (1F) After block [pictured on October 5, 2011]保存されたウェブページへ TEPCO 2011-11-02
15 Process Main Building ; Elevator room (1F) Before block [pictured on July 22, 2011]保存されたウェブページへ TEPCO 2011-11-02
16 Process Main Building ; Elevator room (1F) After Block [pictured on October 10, 2011]保存されたウェブページへ TEPCO 2011-11-02
17 Unit 4 Turbine Building large machine hatch (photo from 2F) Before construction [pictured on July 15, 2011]保存されたウェブページへ TEPCO 2011-11-02
18 Unit 4 Turbine Building large machine hatch (photo from 2F) After construction [pictured on October 12, 2011]保存されたウェブページへ TEPCO 2011-11-02
19 Unit 2 Turbine Building (2F) ; Turbine maintenance hatch Before block [pictured on September 6, 2011]保存されたウェブページへ TEPCO 2011-11-02
20 Unit 2 Turbine Building (2F) ; Turbine maintenance hatch After block [pictured on October 4, 2011]保存されたウェブページへ TEPCO 2011-11-02