戻る

検索結果一覧

    
No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 exposure dose evaluation of the workers at Fukushima Daiichi Nuclear Power Station保存されたウェブページへ TEPCO 2012-09-28
2 Exposure dose distribution (Attachment)保存されたウェブページへ TEPCO 2012-09-28
3 Report on the Progress of Seismic Capacity Evaluation of the Switchyards etc. for Ensuring Reliability of the Offsite Power Supply of our Nuclear Power Stations to the Nuclear Regulatory Authority (FY 2012 Second Quarterly Report)保存されたウェブページへ TEPCO 2012-09-28
4 Report on the Progress of Seismic Capacity Evaluation of the Switchyards etc. for Ensuring Reliability of the Offsite Power Supply of our Nuclear Power Stations to the Nuclear Regulatory Authority (FY 2012 Second Quarterly Report) (Attachment) [ in Japanese]保存されたウェブページへ TEPCO 2012-09-28
5 Report on the Incorrect Input Data Used in the Evaluation of Structural Strength and Seismic Capacity of the Spent Fuel Dry Cask Temporary Storage Facility to the Nuclear Regulatory Authority保存されたウェブページへ TEPCO 2012-09-28
6 Correction made to the report on our facility management plan for Unit 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security" (Version 2) (Revision 2)保存されたウェブページへ TEPCO 2012-09-28
7 Spent fuel dry cask temporary storage facility (Attachment)保存されたウェブページへ TEPCO 2012-09-28
8 Submission of Report on the Current Seismic Safety and Reinforcement of the Reactor Buildings at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority (No.1) (Supplement) (Revision)保存されたウェブページへ TEPCO 2012-09-28
9 「福島第一原子力発電所第1~4号機に対する「中期的安全確保の考え方」に基づく施設運営計画に係る報告書」のうち使用済燃料乾式キャスク仮保管設備の構造強度及び耐震性評価における入力データの誤りへの対応について(報告)保存されたウェブページへ 東京電力 2012-09-28
10 使用済燃料乾式キャスク仮保管設備(別紙)保存されたウェブページへ 東京電力 2012-09-28
11 原子力発電所の外部電源の信頼性確保に係る開閉所等の耐震性評価の進捗状況報告書(2012年度 第2四半期報告)(別紙)保存されたウェブページへ 東京電力 2012-09-28
12 柏崎刈羽原子力発電所、福島第一原子力発電所及び福島第二原子力発電所の点検周期を超過した機器における保安規定違反に関する直接原因、組織体制に起因する根本原因及び再発防止対策につい(概要版)(添付資料)保存されたウェブページへ 東京電力 2012-09-28
13 柏崎刈羽原子力発電所,福島第一原子力発電所及び福島第二原子力発電所の点検周期を超過した機器における保安規定違反に関する直接原因、組織体制に起因する根本原因及び再発防止策について(参考)保存されたウェブページへ 東京電力 2012-09-28
14 Report on the Direct Cause, Root Cause and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to the Inadequate Maintenance of the Measurement Control Equipments Installed in the Units under Long-term Suspension at Kashiwazaki-Kariwa Nuclear Power Station保存されたウェブページへ TEPCO 2012-09-28
15 Report on the Direct Cause, Root Cause and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to the Inadequate Maintenance of the Measurement Control Equipments Installed in the Units under Long-term Suspension at Kashiwazaki-Kariwa Nuclear Power Station (Outline) (Attachment)保存されたウェブページへ TEPCO 2012-09-28
16 Report on the Direct Cause, Root Cause and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to the Inadequate Maintenance of the Measurement Control Equipments Installed in the Units under Long-term Suspension at Kashiwazaki-Kariwa Nuclear Power Station (Reference)保存されたウェブページへ TEPCO 2012-09-28
17 Report on the Root Cause and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to the Inadequate Equipment Maintenance at our Nuclear Power Station保存されたウェブページへ TEPCO 2012-09-28
18 Direct Cause, Root Cause Attributed to the Organizational System and Recurrence Prevention Measures of the Technical Specification Noncompliance Due to Inadequate Equipment Maintenance at Kashiwazaki-Kariwa Nuclear Power Station, Fukushima Daiichi Nuclear Power Station and Fukushima Daini Nuclear Power Station (Outline) " (Attachment)保存されたウェブページへ TEPCO 2012-09-28
19 使用済燃料乾式キャスク仮保管設備の構造強度および耐震性評価における入力データの誤りに関する原子力規制委員会への報告について保存されたウェブページへ 東京電力 2012-09-28
20 「福島第一原子力発電所第1~4号機に対する「中期的安全確保の考え方」に基づく施設運営計画に係る報告書」のうち使用済燃料乾式キャスク仮保管設備の構造強度及び耐震性評価における入力データの誤りへの対応について(報告)(添付資料)保存されたウェブページへ 東京電力 2012-09-28