1 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-01-15]保存されたウェブページへ TEPCO 2014-01-15
2 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-01-15]保存されたウェブページへ TEPCO 2014-01-15
3 The parameters related to the plants (Summary Chart) [as of 5; 00 January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
4 The parameters related to the plants (Summary Chart) [as of 11; 00 January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
5 Situation of water level, transfer and treatment of the accumulated water [9; 00 on January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
6 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-01-15]保存されたウェブページへ TEPCO 2014-01-15
7 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-01-15]保存されたウェブページへ TEPCO 2014-01-15
8 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
9 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
10 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
11 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-01-15保存されたウェブページへ TEPCO 2014-01-15
12 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (2)保存されたウェブページへ TEPCO 2014-01-15
13 Underground reservoir nuclide analysis results (As of January 14, 2014) - underground reservoir observation holes nuclide analysis results (As of January 14, 2014)保存されたウェブページへ TEPCO 2014-01-15
14 Nuclide analysis results of the underground bypass (Investigation holes/Pumping Well) and the sea side observation holes (As of January 14, 2014)保存されたウェブページへ TEPCO 2014-01-15
15 Tritium analysis results of the underground bypass (Investigation holes/pumping well) and the sea side observation holes (As of January 6 and 7, 2014)保存されたウェブページへ TEPCO 2014-01-15
16 Sampling results Regarding the Influence on the water leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) [January 15, 2014]保存されたウェブページへ TEPCO 2014-01-15
17 福島第一原子力発電所 地下水バイパス(調査孔・揚水井)、海側観測孔分析結果 [2014年01月6,7日; 採取]保存されたウェブページへ 東京電力 2014-01-15
18 福島第一原子力発電所 地下水バイパス(調査孔・揚水井)、海側観測孔分析結果 [2014年01月14日; 採取]保存されたウェブページへ 東京電力 2014-01-15
19 福島第一原子力発電所 地下貯水槽・貯水槽観測孔分析結果 [2014年01月14日; 採取]保存されたウェブページへ 東京電力 2014-01-15
20 高レベル濃縮廃液沸騰・乾固に伴う放射性物質移行挙動に係る研究保存されたウェブページへ 日本原子力研究開発機構 2014-01-15