1 Survey map of Fukushima Daiichi Nuclear Power Station - Area around buildings - survey map of area around buildings [on February, 19, 2014]保存されたウェブページへ TEPCO 2014-02-26
2 Survey map of Fukushima Daiichi Nuclear Power Station - Entire power station site - survey map of the entire power station site [on February, 17, 2014]保存されたウェブページへ TEPCO 2014-02-26
3 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-02-26]保存されたウェブページへ TEPCO 2014-02-26
4 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-02-26]保存されたウェブページへ TEPCO 2014-02-26
5 The parameters related to the plants (Summary Chart) [as of 5; 00 February 26, 2014]保存されたウェブページへ TEPCO 2014-02-26
6 The parameters related to the plants (Summary Chart) [as of 11; 00 February 26, 2014]保存されたウェブページへ TEPCO 2014-02-26
7 Situation of water level, transfer and treatment of the accumulated water [9; 00 on February 26, 2014]保存されたウェブページへ TEPCO 2014-02-26
8 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-02-26]保存されたウェブページへ TEPCO 2014-02-26
9 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-02-26]保存されたウェブページへ TEPCO 2014-02-26
10 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [February 26, 2014]保存されたウェブページへ TEPCO 2014-02-26
11 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [February 26, 2014]保存されたウェブページへ TEPCO 2014-02-26
12 Gas sampling results of the Unit 1 PCV gas control system conducted at Fukushima Daiichi Nuclear Power station [2014-02-26]保存されたウェブページへ TEPCO 2014-02-26
13 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 4 Reactor Building保存されたウェブページへ TEPCO 2014-02-26
14 Nuclides analysis result of the radioactive materials in the air at the upper part of Unit 1 Reactor Building保存されたウェブページへ TEPCO 2014-02-26
15 Nuclide analysis of the radioactive materials in the fallouts obtained inside and outside of Fukushima Daiichi Nuclear Power Station [2014-02-26]保存されたウェブページへ TEPCO 2014-02-26
16 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [February 26, 2014]保存されたウェブページへ TEPCO 2014-02-26
17 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-02-26保存されたウェブページへ TEPCO 2014-02-26
18 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (2)保存されたウェブページへ TEPCO 2014-02-26
19 Underground reservoir nuclide analysis results (As of February 25, 2014) - underground reservoir observation holes nuclide analysis results (As of February 25, 2014) - nuclide analysis results of the underground bypass (Investigation holes/Pumping Well) and the sea side observation holes (As of February 25, 2014)保存されたウェブページへ TEPCO 2014-02-26
20 Tritium analysis results of the underground bypass (Investigation holes/pumping well) and the sea side observation holes (As of Feb 17, Feb 18, 2014)保存されたウェブページへ TEPCO 2014-02-26