1 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-03-10]保存されたウェブページへ TEPCO 2014-03-10
2 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-03-10]保存されたウェブページへ TEPCO 2014-03-10
3 The parameters related to the plants (Summary Chart) [as of 5; 00 March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
4 The parameters related to the plants (Summary Chart) [as of 11; 00 March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
5 Situation of water level, transfer and treatment of the accumulated water [9; 00 on March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
6 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-03-10]保存されたウェブページへ TEPCO 2014-03-10
7 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-03-10]保存されたウェブページへ TEPCO 2014-03-10
8 Topics Fukushima (No.40)保存されたウェブページへ Japan Atomic Energy Agency 2014-03-10
9 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
10 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
11 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
12 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-03-10保存されたウェブページへ TEPCO 2014-03-10
13 Underground reservoir nuclide analysis results (As of March 9, 2014)保存されたウェブページへ TEPCO 2014-03-10
14 Sampling results Regarding the water leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South water outlet, drainage channel) 2014-03-10保存されたウェブページへ TEPCO 2014-03-10
15 Sampling results Regarding the Influence on the water leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) [March 10, 2014]保存されたウェブページへ TEPCO 2014-03-10
16 福島第一原子力発電所 地下貯水槽 分析結果 [2014年03月09日; 採取]保存されたウェブページへ 東京電力 2014-03-10
17 東京電力(株)福島第一原子力発電所の20km以遠のモニタリング結果について [2014年03月07日; 測定]保存されたウェブページへ 原子力規制委員会 2014-03-10
18 各都道府県のモニタリングポスト近傍の地上1m高さの空間線量 [2014年03月07日;測定]保存されたウェブページへ 原子力規制委員会 2014-03-10
19 各都道府県のモニタリングポスト近傍の地上1m高さの空間線量 [2014年03月08日;測定]保存されたウェブページへ 原子力規制委員会 2014-03-10
20 各都道府県のモニタリングポスト近傍の地上1m高さの空間線量 [2014年03月09日;測定]保存されたウェブページへ 原子力規制委員会 2014-03-10