戻る

検索結果一覧

    
No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 除染特別地域における除染等工事に係る設計労務単価の改定について(通知)保存されたウェブページへ 環境省 2014-04-09
2 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-04-09]保存されたウェブページへ TEPCO 2014-04-09
3 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-04-09]保存されたウェブページへ TEPCO 2014-04-09
4 The parameters related to the plants (Summary Chart) [as of 5; 00 April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
5 The parameters related to the plants (Summary Chart) [as of 11; 00 April 9, 2014]保存されたウェブページへ TEPCO 2014-04-09
6 Situation of water level, transfer and treatment of the accumulated water [9; 00 on April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
7 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-04-09]保存されたウェブページへ TEPCO 2014-04-09
8 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-04-09]保存されたウェブページへ TEPCO 2014-04-09
9 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
10 Nuclides analysis result of the sub-drain of Fukushima Daiichi Nuclear Power Station [April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
11 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
12 Nuclides analysis result of radioactive materials in the marine soil [2014-04-09]保存されたウェブページへ TEPCO 2014-04-09
13 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
14 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-04-09保存されたウェブページへ TEPCO 2014-04-09
15 Underground reservoir nuclide analysis results (As of April 8, 2014) - nuclide analysis results of the underground bypass (Investigation holes/Pumping Well) and the sea side observation holes (As of April 8, 2014)保存されたウェブページへ TEPCO 2014-04-09
16 Tritium analysis results of the underground bypass (Investigation holes/pumping well) and the sea side observation holes (As of March 31 and April 1, 2014)保存されたウェブページへ TEPCO 2014-04-09
17 Sampling results Regarding the water leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South water outlet, drainage channel) 2014-04-09保存されたウェブページへ TEPCO 2014-04-09
18 Sampling results Regarding the Influence on the water leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) [April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
19 Sampling results Regarding the Influence on the water leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area) [April 09, 2014]保存されたウェブページへ TEPCO 2014-04-09
20 福島第一原子力発電所 地下貯水槽・地下水バイパス(調査孔・揚水井)、海側観測孔分析結果 [2014年04月08日; 採取]保存されたウェブページへ 東京電力 2014-04-09