No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-05-12]保存されたウェブページへ TEPCO 2014-05-12
2 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-05-12]保存されたウェブページへ TEPCO 2014-05-12
3 Results of water level measurement at sub-drain pits around Units 1-6 (Apr. 1 - Apr. 30, 2014)保存されたウェブページへ TEPCO 2014-05-12
4 Results of water level measurement at sub-drain pits around Central Radioactive Waste treatment facility (Apr. 1 - Apr. 30, 2014)保存されたウェブページへ TEPCO 2014-05-12
5 The parameters related to the plants (Summary Chart) [as of 5; 00 May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
6 The parameters related to the plants (Summary Chart) [as of 11; 00 May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
7 Situation of water level, transfer and treatment of the accumulated water [9; 00 on May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
8 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-05-12]保存されたウェブページへ TEPCO 2014-05-12
9 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-05-12]保存されたウェブページへ TEPCO 2014-05-12
10 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
11 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
12 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
13 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-05-12保存されたウェブページへ TEPCO 2014-05-12
14 Underground reservoir nuclide analysis results (As of May 11, 2014)保存されたウェブページへ TEPCO 2014-05-12
15 Sampling results Regarding the water leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South water outlet, drainage channel) 2014-05-12保存されたウェブページへ TEPCO 2014-05-12
16 Sampling results Regarding the Influence on the water leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) [May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
17 Sampling results Regarding the Influence on the water leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area) [May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
18 Sampling results of sub-drain water regarding wrong transfer of accumulated water to the incineration workshop building [May 12, 2014]保存されたウェブページへ TEPCO 2014-05-12
19 福島第一原子力発電所 地下貯水槽 分析結果 [2014年05月11日; 採取]保存されたウェブページへ 東京電力 2014-05-12
20 東京電力(株)福島第一原子力発電所の20km圏内の空間線量率測定結果 [2014年05月06日~2014年05月08日;測定]保存されたウェブページへ 原子力規制委員会 2014-05-12