No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-06-04]保存されたウェブページへ TEPCO 2014-06-04
2 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-06-04]保存されたウェブページへ TEPCO 2014-06-04
3 The parameters related to the plants (Summary Chart) [as of 5; 00 June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
4 The parameters related to the plants (Summary Chart) [as of 11; 00 June 4, 2014]保存されたウェブページへ TEPCO 2014-06-04
5 Situation of water level, transfer and treatment of the accumulated water [9; 00 on June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
6 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-06-04]保存されたウェブページへ TEPCO 2014-06-04
7 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-06-04]保存されたウェブページへ TEPCO 2014-06-04
8 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
9 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
10 Sampling results Regarding the Discharge of Groundwater bypass at Fukushima Daiichi Nuclear Power Station (Around South water Outlet) (Revised Version) [2014-06-04]保存されたウェブページへ TEPCO 2014-06-04
11 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
12 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-06-04保存されたウェブページへ TEPCO 2014-06-04
13 Underground reservoir nuclide analysis results (As of June 3, 2014) - nuclide analysis results of the underground bypass (Investigation holes/Pumping Well) and the sea side observation holes (As of June 3, 2014)保存されたウェブページへ TEPCO 2014-06-04
14 Tritium analysis results of the underground bypass (Investigation holes/pumping well, 2014) and the sea side observation holes (As of May 26 and 27, 2014)保存されたウェブページへ TEPCO 2014-06-04
15 Sampling results Regarding the water leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South water outlet, drainage channel) 2014-06-04保存されたウェブページへ TEPCO 2014-06-04
16 Sampling results Regarding the Influence on the water leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) [June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
17 Analysis results of rainwater obtained inside the dike at the tank area after treated by the rainwater treatment system [2014-06-04]保存されたウェブページへ TEPCO 2014-06-04
18 Sampling results of pump wells of the groundwater bypass at Fukushima Daiichi Nuclear Power Station [June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04
19 Sampling results Regarding the Influence on the water leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area) [June 06, 2014]保存されたウェブページへ TEPCO 2014-06-04
20 Sampling results of sub-drain water regarding wrong transfer of accumulated water to the incineration workshop building [June 04, 2014]保存されたウェブページへ TEPCO 2014-06-04