戻る

検索結果一覧

    
No. タイトル 情報提供機関/著者 掲載日/会議開催日
1 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-06-17]保存されたウェブページへ TEPCO 2014-06-17
2 Fixed point monitoring status by temporary monitoring post at Fukushima Daiichi Nuclear Power Station monitoring data by a monitoring car at Fukushima Daiichi Nuclear Power Station [Measurement Date; 2014-06-17]保存されたウェブページへ TEPCO 2014-06-17
3 The parameters related to the plants (Summary Chart) [as of 5; 00 June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
4 The parameters related to the plants (Summary Chart) [as of 11; 00 June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
5 Situation of water level, transfer and treatment of the accumulated water [9; 00 on June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
6 Nuclides analysis result of the radioactive materials in the air at Fukushima Nuclear Power Stations [2014-06-17]保存されたウェブページへ TEPCO 2014-06-17
7 Nuclides analysis result of the radioactive materials in the seawater coast, Fukushima Daiichi Nuclear Power Station [2014-06-17]保存されたウェブページへ TEPCO 2014-06-17
8 Radioactivity density of the seawater in the port of Fukushima Daiichi Nuclear Power Station [June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
9 Nuclides analysis result of the sub-drain of Fukushima Daiichi Nuclear Power Station [June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
10 Nuclides analysis result of the sub-drain water in the surroundings of the Central Radioactive Waste treatment facility [June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
11 Results of the radioactive material analysis related to the leaked water from the pipeline connecting from desalination system (Reverse Osmosis Membrane) to concentrated water storage tank in Fukushima Daiichi Nuclear Power Station Unit 1 to 4 side of South Discharge Channel [June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
12 Detailed analysis results in the port of Fukushima Daiichi Nuclear Power Station, around discharge channel and bank protection (Sampling Locations of underground water Obtained at Bank Protection) 2014-06-16保存されたウェブページへ TEPCO 2014-06-17
13 Underground reservoir nuclide analysis results (As of June 16, 2014) - nuclide analysis results of the underground bypass (Investigation holes/Pumping Well) and the sea side observation holes (As of June 16, 2014)保存されたウェブページへ TEPCO 2014-06-17
14 Sampling results Regarding the water leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South water outlet, drainage channel) 2014-06-17保存されたウェブページへ TEPCO 2014-06-17
15 Sampling results Regarding the Influence on the water leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) [June 17, 2014]保存されたウェブページへ TEPCO 2014-06-17
16 Sampling results Regarding the Influence on the water leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area) [June 19, 2014]保存されたウェブページへ TEPCO 2014-06-17
17 福島第一原子力発電所 地下貯水槽・地下水バイパス(調査孔)、海側観測孔分析結果 [2014年06月16日; 採取]保存されたウェブページへ 東京電力 2014-06-17
18 各都道府県のモニタリングポスト近傍の地上1m高さの空間線量 [2014年06月16日; 測定]保存されたウェブページへ 原子力規制委員会 2014-06-17
19 プラント関連パラメータ(総括表) [2014年06月17日 5時00分; 現在]保存されたウェブページへ 東京電力 2014-06-17
20 プラント関連パラメータ(総括表) [2014年06月17日 11時00分; 現在]保存されたウェブページへ 東京電力 2014-06-17