Results and assessment of measurements on groundwater bypass temporary storage tank water
(上位階層ページタイトル/会議名: New topics)
情報提供機関: 東京電力
掲載日/会議開催日: 2013-06-12
Results and assessment of measurements on groundwater bypass temporary storage tank water (Reference)
(上位階層ページタイトル/会議名: Results and assessment of measurements on groundwater bypass temporary storage tank water)
Outside appearance of the laboratory building (with one story above ground and one below)
掲載日/会議開催日: 2013-06-11
Ge semiconductor detectors installed in the new laboratory (in the first basement)
Overview of the underground bypass facility
掲載日/会議開催日: 2013-06-05
Overview of the underground bypass facility (2:12)
(上位階層ページタイトル/会議名: Overview of the underground bypass facility)
Progress status of the groundwater bypass construction
掲載日/会議開催日: 2013-03-29
Installation of pump well No.1 and pump well facility (A system) completed
(上位階層ページタイトル/会議名: Progress status of the groundwater bypass construction)
Installation of pump well No.9 (B system) completed
Installation of pump well No.11 (system C) completed
Foundation installation for piping (B system)
Transfer pipe installation (each system - temporary storage tank - sea)
Temporary storage tank installation
Transfer pipe installation (C system, temporary storage tank - sea)