検索結果一覧: 1-6 / 6
検索項目(タイトル、種別等)を切り替えることができます
検索条件を追加
検索項目(WARP保存日等)を切り替えることができます
ページに表示されているデータを出力します
Fukushima Daiichi Nuclear Power Station (Length; 5 minutes 30 seconds) (5; 30)
(上位階層ページタイトル/会議名: Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Dai-ichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool)
情報提供機関: 東京電力
掲載日/会議開催日: 2012-12-20
Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station (A steel beam falling into the pool) (3; 39) Video recorded on September 22, 2012
(上位階層ページタイトル/会議名: Debris removal from Unit 3 spent fuel pool at Fukushima Dai-ichi Nuclear Power Station)
掲載日/会議開催日: 2012-09-24
Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station (0; 29) Video recorded on September 22, 2012
Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station (1) (1; 00) Video recorded on September 24, 2012
Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station (2) (2; 00) Video recorded on September 24, 2012
Appendix; Evaluation of the Report (Part 1) on the facility operation plan based on the "Concept of Securing the Medium-Term Safety" for Units 1 to 4 at Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Co., Inc.
(上位階層ページタイトル/会議名: Regarding Evaluation Results of the Report (Part 1) from Tokyo Electric Power Co., Inc. (TEPCO) on “The Concept of Securing the Medium-Term Safety” for Units 1 to 4 at Fukushima Dai-ichi Nuclear Power Station, TEPCO)
情報提供機関: 経済産業省
掲載日/会議開催日: 2011-12-12